1976 Company established
1977 Slipforming technology improved with the experience in jacking
the formwork with a hydraulic jack system applied to the
placement of cassisons
1978 Entered into technical cooperation with GSB, Germany,
importing the conical slipform technology
1980 Set the record of simultaneously slipforming 10-8.5m silos
1981 Successfully acquired "Conical Slipforming" technology
1982 Undertook the construction of cement silos for P.T. Indocement
Tunggal Prakarsa, and grain silos and pellet silos for Bogasari
Flour Mills in Indonesia, opening up the door to overseas
market of construction
Undertook Chien Kuo N-S Viaduct, section from Chang An E.
Road to Jen Ai Road.
1983 Set the record of simultaneously slipforming 12-10m bins
1984 Initiated the application of slipforming to non-round-sectional
highrises
Matched prestressing with slipforming
1985 Undertook the construction of the first large-scale parking tower
in Taiwan
1986 Undertook the construction of a 138-m chimney, the tallest ever
built by our own fellow people
Experienced and acquired the technology of laying refractory for a chimney
1989 Undertook the construction of the chimney for the first
incineration plant in Taiwan
1991 Successfully completed the turn-key project of 60,000 ton grain
silos
1992 Applied "integrated technology of combing slipforming with
steel structure" to highrise plant
Introduced the egg-shaped form system from RSB-Roundtech,
Austria and pre-stressing system from Vorspann-Technik,
Austria
1993 Experienced the technology of steel liner 6.7 m x H 250 m
Experienced the technology of hoisting 600-ton steel liner
Experienced the welding of nickel-alloy wallpaper
1994 Completed the first of the two 250-m chimneys, a turn-key
project and the tallest chimneys ever constructed by our own
fellow people
Set up Ting Tai Construction Co., Ltd. Representative Office in
Indonesia
Undertook the expansion project of silo complex for Bogasari
Flour Mills in Jakarta and Surabaya, with the total capacity
reaching 727,180 tons
Completed Pali Egg-shaped Digesters and Energy Recovery
System (civil portion)
1995 Set up Ting Tai Construction (S) Pte. Ltd. in Singapore
Completed turnkey project of two 250-m chimneys for units
5-8 at TPC's Taichung Fossil Power Station, which was
awarded the First Place in 1995 Public Works Quality
Evaluation by Ministry of Economic Affairs and the Superior
Grade in 1995 Public Works Quality Evaluation by Executive
Yuan
Pali Egg-shape Digesters and the Energy Recovery System
(civil portion) won the Superior Grade in Public Works Quality
Evaluation by Executive Yuan
1996 Awarded by Ministry of Interior Affairs "Award of 1995
Outstanding Construction"
Achieved ISO 9002 International Quality Management System


[About Ting Tai] [Organization Chart] [Technical Milestones] [Honor or encourage]


TING TAI CONSTRUCTION CO., LTD.
9F-1,376 Sec.4 Jen-Ai Road Taipei
Taiwan 106 Republic of China
Tel:886-2-27092706 Fax:886-2-27071079

If you have any question,send Email to us.